Data and statistics

Coal domestic supply, absolute and relative year-on-year change 2019-2020

Open

Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE with flexible power plants

Open

Yearly evolution of minimum-take capacity in all contracts in Thailand, 2019-2049

Open

Operational cost savings from a flexible fuel supply contract in 2030 based on 15% VRE penetration

Open

Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE (ASEAN RE) with flexible power plants - Base 2030

Open

Thailand's generation mix and CO2 emissions in the PDP Scenario, 2030

Open

Thailand's generation mix and CO2 emissions in the PDP and Flex Scenarios, 2030

Open

Generation mix and CO2 emission in Thailand in the Power Development Plan scenario and Flex scenario, 2030

Open

Generation mix and CO2 emission in Thailand in the Power Development Plan scenario, 2030

Open