Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE with flexible power plants Openexpand
Operational cost savings from a flexible fuel supply contract in 2030 based on 15% VRE penetration Openexpand
Generation by fuel type during the period of minimum net demand (1-2 Jan) in 2030 with 15% share of VRE (ASEAN RE) with flexible power plants - Base 2030 Openexpand
Generation mix and CO2 emission in Thailand in the Power Development Plan scenario and Flex scenario, 2030 Openexpand