Children in Balabanovo will receive a club

Социальный-компас_new.jpg

Each children's camp has the necessary list of objects that should be available. First of all, a dining room, dormitories, a medical center and, of course, a club.

The old club building in the “Young Metro Builder” children's camp had long since fallen into disrepair and could not be used.

In 2015, the management of Mosmetrostroy decided to revive the legendary camp. We started with the most necessary things - we restored places that provide children with food, rest, cleanliness and health - they are already functioning perfectly and hosting hundreds of children from different cities of our country for the summer. The second stage of the camp's restoration was the club building.

The Inzhproekt Institute developed the design documentation for the future building, and construction was entrusted to JSC "USR Mosmetrostroy" headed by Alexander Bondarenko.

The construction of the facility began in May: they made a fence, accepted concrete, and delivered metal structures manufactured by UMM. TSK is in charge of logistics.

Work was suspended during the summer shifts. Now the jib cranes have started working again on the territory.

SMU-25 has already begun installing heating and water supply systems. By winter it is planned to close the building circuit and supply heat. After this, interior finishing will begin.

The two-story club will house a transformable hall with 250 seats and utility rooms. If necessary, the seats can be removed and the room's capabilities can be expanded.

According to Inzhproekt specialists, after the completion of the club, it is planned to build a swimming pool at the third stage.