Elektrozavodskaya station

JSC "Mosmetrostroy" is a diversified construction company that carries out contract based on the construction from scratch of metro, underground, transport, civil and other facilities structures. Metrostroy was founded in 1931 and laid the foundations for domestic metro construction. The first line of the Moscow metro was built in record time and commissioned in commissioned on May 15, 1935.
Elektrozavodskaya station (North-eastern section of the BCL)
Opening date

December 31, 2020

Location

The station is located in the Basmanny district of the Central Administrative District, on the left bank of the Yauza River, along the Semenovskaya embankment, north of the historical area of the Vvedenskie Mountains and south of the Ryazan railway line.

Station design

Shallow column station (20 m), with an island platform. 

Subcontractors

TO-6 Metrostroy.

Stroymekhservice.

USR Mosmetrostroy.

SMU-24 Metrostroy.

SMU-25 Metrostroy.      