On the territory of New Moscow in the Voronovskoye settlement, near the village of Golokhvastovo.
On the territory of New Moscow in the Voronovskoye settlement, near the village of Golokhvastovo.
JSC "Mosmetrostroy" was involved in the construction of the following buildings: A8 - pathology block, A9 - waste disinfection, A10 - laboratory, A11 - utility block, A12 - vehicle washing and sanitation block, B13 - disinfection department with laundry and storage rooms for personal belongings, B14 - equipment sterilization center. The list of works included: installation of building frames with wall and roof cladding with sandwich panels, construction of internal partitions, door blocks, windows, finishing work for future hospital premises.
A large scope of work was carried out on engineering systems (heating, ventilation, air conditioning, electrical equipment, electric lighting, power supply, etc.) in the listed buildings, as well as at checkpoints - AKP1, AKP2, BKP1, BKP2, VKP1.
SMU-1 Metrostroy
SMU-6 Metrostroy
SMU-8 Metrostroy
SMU-12 Mosmetrostroy
SMU-24 Metrostroy
SMU-25 Metrostroy
TO-6 Metrostroy
Tunnel 2001
USR Mosmetrostroy